{
  "title": "Phoenix, AZ Fence Permits: Height, Walls and Application Checklist",
  "citySlug": "phoenix-az",
  "reviewedAt": "2026-10-23",
  "jurisdiction": "Phoenix, AZ",
  "scope": "City of Phoenix residential planning using published city handouts and Zoning Ordinance 703. The code publisher is current through December 3, 2025; later amendments and parcel conditions require city confirmation. Handouts disagree on structural-review thresholds; no definitive threshold is asserted here.",
  "articleUrl": "https://fenceadvisors.com/blog/phoenix-az-fence-permits-code",
  "evidenceKind": "Editorial compilation of official guidance; not original law or an approval",
  "sources": [
    {
      "id": "phoenix-zoning",
      "label": "Phoenix Zoning Ordinance 703",
      "url": "https://phoenix.municipal.codes/ZO/703",
      "locator": "703.A.1-2 and D",
      "version": "Publisher current through G-7461, December 3, 2025; reviewed October 23, 2026"
    },
    {
      "id": "phoenix-permits",
      "label": "Phoenix fence and retaining-wall permit handout",
      "url": "https://www.phoenix.gov/content/dam/phoenix/pddsite/documents/trt/external/dsd_trt_pdf_00181.pdf",
      "locator": "Permit exemption and retaining-wall table",
      "version": "TRT/DOC/00181, revised July 2013; still linked by city fence page at review"
    },
    {
      "id": "phoenix-exempt",
      "label": "Phoenix Work Exempt from Permit handout",
      "url": "https://www.phoenix.gov/content/dam/phoenix/pddsite/documents/trt/external/dsd_trt_pdf_00618.pdf",
      "locator": "105.2.1 Building, item 2 and commentary",
      "version": "Retrieved October 23, 2026; no fresh revision date inferred"
    },
    {
      "id": "phoenix-entry",
      "label": "Phoenix residential fences and walls",
      "url": "https://www.phoenix.gov/administration/departments/pdd/residential-building/resident-plan-reviews/fences-walls.html",
      "locator": "Application and requirement links",
      "version": "Current entry page reviewed October 23, 2026"
    }
  ],
  "facts": [
    {
      "id": "permit",
      "topic": "Permit exemption",
      "text": "Published Phoenix handouts use a 3-foot ordinary residential fence exemption. A zoning allowance of 40 inches does not make a 40-inch fence permit-free.",
      "sourceIds": [
        "phoenix-permits",
        "phoenix-exempt"
      ]
    },
    {
      "id": "front",
      "topic": "Front yard",
      "text": "Section 703.A.2 generally limits required residential front-yard fences to 40 inches; HP and HP-L properties have a 3-foot limit extending into the side yards as specified by the code.",
      "sourceIds": [
        "phoenix-zoning"
      ]
    },
    {
      "id": "rear",
      "topic": "Side and rear",
      "text": "Required residential side/rear yards generally have a 6-foot fence limit. Arterial noise walls and other enumerated exceptions have their own conditions.",
      "sourceIds": [
        "phoenix-zoning"
      ]
    },
    {
      "id": "measurement",
      "topic": "Measuring height",
      "text": "Section 703.A.1 measures from the higher adjacent finished-grade elevation, averaged perpendicular within 50 feet of the fence. Do not assume the visible low-side panel height is the code measurement.",
      "sourceIds": [
        "phoenix-zoning"
      ]
    },
    {
      "id": "conflict",
      "topic": "Structural review",
      "text": "The linked fence handout describes a 7-foot structural-design threshold; the separate exemption handout describes 6 feet. Ask Phoenix to identify the current provision for the actual design before relying on either number.",
      "sourceIds": [
        "phoenix-permits",
        "phoenix-exempt"
      ]
    }
  ],
  "checklist": [
    "Confirm Phoenix jurisdiction and the parcel's zoning/HP status.",
    "Mark required yards, property lines, visibility areas and easements.",
    "Show fence height, materials, gates and actual grade information.",
    "Identify retaining walls, surcharge loads and combined wall/fence designs.",
    "Ask Phoenix to confirm permit scope and the current structural-review rule.",
    "Use the official application entry; confirm fees, inspections and approvals."
  ],
  "reuse": "Original compilation and worksheet: CC BY 4.0. Third-party source documents are not relicensed."
}
