Fence PermitsColorado SpringsColorado

Colorado Springs Fences Seven Feet or Less: Regional Building Exemption

By Fence Advisors·
Conceptual foothill neighborhood with evergreens, wood rail fencing and distant mountain ridges beside fence samples, blank folder sheets, a yellow pencil and metal square.

Colorado Springs, CO / Fence permit planning

Regional building-permit guidance for ordinary new residential yard fences not more than seven feet, including exactly seven, inside Colorado Springs; pool barriers, retaining structures, powered equipment and separately regulated work are excluded from the ordinary exemption. City 7.4.1404 adopts the 2023 Pikes Peak Regional Building Code, whose RBC105.2.1 Building item 3 supplies the exemption; the reviewed second printing is not an exhaustive later-ordinance audit. City Planning applicability and its actual ordinary-fence application remain unresolved, with no city review declared universally required, optional or unnecessary and no exact-seven placement permission. No numerical city height, grade, setback, visibility, repair or variance entitlement is supplied; confirm zoning/PD, special sites, boundaries and separate approvals. PPRBD valuation/plan-review charges are not assigned to covered exempt work, and no all-approval total, turnaround, parcel approval or engineering design is established.

Sources and scope checked .

An ordinary new fence not more than seven feet high is exempt from the Pikes Peak Regional Building Department building permit under adopted RBC105.2.1 Building item 3. Exactly seven feet is included in that regional exemption. City Planning approval is a separate, unresolved classification: the exemption is not permission to place a fence at that height anywhere in Colorado Springs. This guide supplies no city height, grade or visibility allowance and no all-approval exemption. 2023 Pikes Peak Regional Building Code, second printing; Colorado Springs adoption of the regional building code; Colorado Springs Zoning and Standards

Use this guide for the regional building-permit question on ordinary new residential yard fencing inside Colorado Springs. Separate pool barriers, retaining structures, powered equipment and other regulated work. Ask Colorado Springs fence contractors to document the regional exemption and the city's actual Planning determination in the quote rather than describe the whole job as either universally permitted or universally exempt.

Quick reference

QuestionSource-checked answer
Positive regional building answerRBC105.2.1 Building item 3 exempts fences not more than seven feet from the regional building permit. Exactly seven is included for that permit question only; this does not establish city placement permission or waive separate regulated work. 2023 Pikes Peak Regional Building Code, second printing; PPRBD work exempt from permits
Why this regional rule appliesCity 7.4.1404 adopts the 2023 Pikes Peak Regional Building Code with local modifications. The retained adopted provisions do not replace its ordinary fence exemption. A general upload or supplement date is not a new fence-rule effective date. Colorado Springs adoption of the regional building code; 2023 Pikes Peak Regional Building Code, second printing
City Planning is a separate decisionThe regional homeowner guidance makes a city-zoning statement not operationally reconciled with the reviewed city sources. Ask City Planning whether this fence needs an application, another clearance or no separate application. None is declared universal here. PPRBD homeowner permit process; Colorado Springs Zoning and Standards; Colorado Springs city fence provisions
Jurisdiction and layoutPPRBD serves multiple jurisdictions, while Colorado Springs zoning applies to the responsible city property. Use the city's official zoning and SpringsView resources, then establish actual lot lines and easements. The regional exemption is not a city height, grade or visibility formula. Colorado Springs Zoning and Standards; Official SpringsView replacement map; Colorado Springs fence guidance
If separate regional work needs a permitPPRBD's homeowner route is for qualifying work on a primary residence owned and occupied by the applicant, not pulling a permit for a hired contractor. These conditions concern actually permitted scope; exempt fencing alone is not directed into that application. PPRBD homeowner permit process; PPRBD Start a Project
Do not charge exempt work as permitted workThe regional fee schedule describes valuation and plan-review charges for applicable permits. Those rates are not assigned here to covered exempt fencing. City or special-scope fees remain conditional on the actual review; no flat fence fee or all-approval total is verified. 2023 Pikes Peak Regional Building Code, second printing; PPRBD official fee schedule; Colorado Springs application checklists

Two authorities answer different questions

PPRBD administers a regional building code across multiple jurisdictions. Colorado Springs separately administers city zoning, development and special-site requirements. A Colorado Springs mailing address or a regional service boundary does not establish the city zoning authority for a particular property. Start with the city's Zoning and Standards entry and its official property-research resources. Colorado Springs Zoning and Standards

The official SpringsView entry now supplies a migration notice directing readers to its replacement map. That is not evidence the city's mapping service has disappeared. Use the official replacement map for context, then establish legal lot lines and easements from appropriate records. The map does not establish a survey boundary, parcel approval or planned-development determination. Official SpringsView replacement map

An HOA's consent, a neighboring fence or a contractor's service area does not answer either authority's question. Keep private restrictions and access rights separate from municipal approval. Where the line or easement is disputed, resolve that issue before ordering panels or setting posts; an application drawing does not decide ownership.

The regional exemption includes the endpoint

City 7.4.1404 adopts the 2023 Pikes Peak Regional Building Code with local modifications. The code's reviewed second printing is dated June 30, 2026. Its Building exemption list says fences not more than seven feet, and the reviewed city modifications do not replace that ordinary fence item. That adopted wording includes equality for this particular building-permit question. It is not an unmodified model-code exemption borrowed from another municipality. Colorado Springs adoption of the regional building code; 2023 Pikes Peak Regional Building Code, second printing

The official Work Exempt and Start a Project resources corroborate the regional exemption. The homeowner page uses stricter shorthand, but that shorthand is not substituted for the inclusive adopted provision. This does not approve an exactly-at-the-threshold city placement or resolve how the city measures a proposed fence. Those are separate questions. PPRBD work exempt from permits; PPRBD Start a Project; PPRBD homeowner permit process

Describe the complete proposed assembly, not just the manufacturer's nominal panel height. Identify gates, posts, changes in grade and any wall or powered component so the responsible reviewer can classify the actual scope. This guide does not offer a measurement formula, structural specification or permission to alter grade to fit the exemption.

Obtain the city's actual Planning classification

The regional homeowner page makes a separate statement about Colorado Springs zoning approval. The reviewed city sources do not reconcile that statement into a clear ordinary-fence application rule. Therefore this guide declares no city application universally required, optional or unnecessary. Ask City Planning to identify whether the actual compliant fence needs a zoning application, another clearance or no separate application, and retain that response before installation. PPRBD homeowner permit process; Colorado Springs Zoning and Standards; Colorado Springs city fence provisions

City fence provisions and department guidance also contain location and measurement qualifications that cannot be collapsed into one universal layout. We deliberately publish no numerical city front/rear height, grade basis, setback or sight triangle. Do not treat the regional building threshold as a city zoning maximum or use a permit exemption as permission to obstruct traffic visibility or drainage. Colorado Springs city fence provisions; Colorado Springs fence guidance

The city application-checklist index provides several scope-specific routes. Its existence does not establish that every ordinary fence requires a Development Plan, historic application or variance. Ask which route actually applies instead of submitting all of them or using an exceptional front-fence variance as the ordinary backyard process. No scheduled code-update project or staff recommendation is presented here as enacted citywide law. Colorado Springs application checklists

Prepare useful information without buying an unnecessary permit

A clear planning sketch can identify the property, proposed fence runs and gates, materials, complete height, nearby streets and driveways, known easements and relevant site conditions. These are practical inputs to the classification discussion, not a mandatory City Planning field list. Confirm the actual documents only after the city identifies the applicable review. A fence-only proposal is not automatically a new-house plan package.

Do not submit a paid PPRBD building-permit application solely for fencing that falls within the verified regional exemption. If other work independently needs a regional permit, the adopted application provisions require scope and property identification, applicable documents, applicant authority and other relevant information. Those requirements belong to that permitted work, not to an invented application for the exempt fence. 2023 Pikes Peak Regional Building Code, second printing

PPRBD's public project wizard is an official starting resource, not proof of a completed permit or city Planning decision. Its initial public step does not establish the full application requirements. Follow the current official instructions if separate scope needs a permit. PPRBD Start a Project

Roles, fees and project records

For actually permitted regional work, PPRBD limits its homeowner route to qualifying work on the applicant's owned and occupied primary residence. It is not a way to pull a homeowner permit for a hired contractor. Applicable contractor requirements depend on the permitted scope. None of that makes an exempt ordinary fence require a homeowner application simply to document the exemption. PPRBD homeowner permit process

The regional fee schedule describes valuation-based permit and plan-examination charges. We do not assign those charges to covered exempt fencing, infer a flat fence fee or total possible city and special-site approvals. If City Planning assigns a review, obtain its actual fee classification; if another component needs a regional permit, confirm that component's invoice. No guaranteed approval or installation timetable is supplied. PPRBD official fee schedule; Colorado Springs application checklists

Keep the city determination, any separately issued approval and the reviewed design with the contract. Specify who answers corrections, obtains any required consent and arranges applicable inspections. Arrange utility locating before excavation. A regional exemption is not a certificate that all zoning, drainage, pool, retaining or electrical requirements have been satisfied.

Before-you-build checklist

  1. Confirm Colorado Springs jurisdiction, zoning and actual lot lines; a postal address or regional service area is not enough.
  2. Describe the new fence's complete height, material and location; separate pool, retaining and powered components.
  3. Confirm the regional exemption covers the fence; its height threshold is not city placement permission.
  4. Ask City Planning which zoning review or application applies before work; do not assume it is required or waived.
  5. Prepare relevant site information, resolve special approvals and confirm fees only for reviews actually required.
  6. Retain written determinations and any issued approvals; arrange utility locating and follow applicable inspection instructions.
Colorado Springs fence permit planning sheet: Qualifying fences seven feet or less: regional building exemption; city Planning classification unresolved. Six preparation checks; the complete accessible checklist and source-checked rules are in this article.
Original Fence Advisors planning sheet for Colorado Springs, CO, reviewed October 24, 2026. Use it with this guide's scope, exceptions and official sources; not an approval or construction drawing.
Download or embed this graphic

SVGPNGCC BY 4.0

<figure>
  <a href="https://fenceadvisors.com/blog/colorado-springs-co-fence-permits-code"><img src="https://fenceadvisors.com/media/research/colorado-springs-co-permit-cheat-sheet.svg" alt="Colorado Springs fence permit planning sheet: Qualifying fences seven feet or less: regional building exemption; city Planning classification unresolved. Six preparation checks; the complete accessible checklist and source-checked rules are in this article." width="850" height="1100" loading="lazy" style="max-width:100%;height:auto"></a>
  <figcaption>Graphic: <a href="https://fenceadvisors.com/blog/colorado-springs-co-fence-permits-code">Fence Advisors</a>. Source, period and limitations are in the linked article. Original graphic: CC BY 4.0.</figcaption>
</figure>

Use the Colorado Springs contractor directory, Colorado directory and national contractor directory for hiring and geographic navigation. The national permit navigator helps identify the responsible authority. The Denver guide covers another Colorado jurisdiction, not the Colorado Springs approval question.

The buyer checklist helps assign application and completion responsibilities. The setback and easement guide explains the concepts without settling a Colorado Springs boundary or consent issue.

Sources and reuse

We checked the linked government guidance on October 24, 2026. The scope above and source notes identify what was verified and what still needs confirmation. This article is not an ordinance, survey, engineering design, legal opinion or permit approval. The downloadable fact sheet records each finding's source and section. Confirm current rules, fees and submission instructions with the responsible authority before ordering materials or starting work.

You may reuse our original cheat sheet with attribution to this article. Keep the review date, jurisdiction and limitations attached. Government documents remain with their original publishers. Send corrections with a source link to editorial@fenceadvisors.com.

Sources and Downloads

Original Fence Advisors graphics, data compilations and worksheet are available under CC BY 4.0. Retain source, period and scope when reusing data. This license does not relicense third-party documents or trademarks.

Corrections: editorial@fenceadvisors.com.

Plan your Colorado Springs fence project

Confirm the approvals for your property, then compare written contractor scopes.

Get the next guide in your inbox

Fence costs, rankings, and what AI is telling homeowners — researched, no fluff.

Fence industry insights — costs, rankings, and what AI is telling homeowners. No spam, unsubscribe anytime.